The Spanish Gransolar Group was granted the authorization to build two solar power plants located in the state of Piaui, municipalities of Sao Joao do Piaui and Joao Costa (60 MW in total capacity). The 35-year contracts were signed with the regulatory agency ANEEL starting in March 2016. The company Gransolar Group created two special purpose companies to manage the projects:

Sertao I Solar Ener

Status
Prospective
Sector
Commercial, Natural Gas, Government, Power Generation (CCGT), Solar, Steel, Manufacturing (Industrial)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Sertao I and Sobral I Solar Power Plants

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Sertao I and Sobral I Solar Power Plants” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Spanish Gransolar Group was granted the authorization to build two solar power plants located in the state of Piaui, municipalities of Sao Joao do Piaui and Joao Costa (60 MW in total capacity). The 35-year contracts were signed with the regulatory agency ANEEL starting in March 2016. The company Gransolar Group created two special purpose companies to manage the projects: Sertao I Solar Energia SPE Ltda. - UFV Sertao I (30MW) Sobral I Solar Energia SPE Ltda. - UFV Sobral I (30MW) The total investment in the power plants was estimated at US$ 799.6 million (BRL 252.84 million), financed with the sponsor's equity. Construction works commenced in January 2017, and were expected to be concluded by 2017. As of June 2017, the construction works were in its final stages. In November 2016, Gransolar sold 85% of its shares in the project to Spanish company Gas Natural Fenosa, through its subsidiary Global Power Generation (GPG). The government periodically runs public bidding for the sale of energy to the country´s distribution companies. Sertao I and Sobral I won the public bidding that took place in August 2015 by offering an average tariff of US$ 91/MWh (BRL 303.5/MWh). The project companies signed 20-year power purchase agreements with the several electricity distribution companies. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Natural Gas, Government, Power Generation (CCGT), Solar, Steel, Manufacturing (Industrial)

Article published date

2024-05-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project