Serve Ellwood Offsite Utility Extension
Sector: Power Transmission • Location: Manvel, Texas, United States of America
Source: Dodge USA
BCMUD No. 57, Water and Wastewater Collection to serve Ellwood Offsite Utility Extension Project scope shall include the installation of approximately 3,675 LF of 12 PVC waterline; 400 LF of 12 PVC water by Trenchless Construction with Steel Casing; 435 LF of 12 ductile iron pipe; 1,085 LF of 12 -15 PVC sanitary sewer; 4,825 LF of PVC force main; and 595 LF of PVC force main by Trenchless Construc
- Status
- Prospective
- Sector
- Power Transmission, Steel, Metal, Waste Processing and Treatment, Water Supply and Storage, Government, Commercial, Raw Materials, Power Generation (CCGT)
- Location
- Manvel, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Serve Ellwood Offsite Utility Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | BCMUD No. 57, Water and Wastewater Collection to serve Ellwood Offsite Utility Extension Project scope shall include the installation of approximately 3,675 LF of 12 PVC waterline; 400 LF of 12 PVC water by Trenchless Construction with Steel Casing; 435 LF of 12 ductile iron pipe; 1,085 LF of 12 -15 PVC sanitary sewer; 4,825 LF of PVC force main; and 595 LF of PVC force main by Trenchless Construction with Steel Casing. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Manvel |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Steel, Metal, Waste Processing and Treatment, Water Supply and Storage, Government, Commercial, Raw Materials, Power Generation (CCGT) |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
