logo

Set Houses with One Pillar / Buero Wagner

Sector: Road • Location: Abler

Source: ArchDaily

Project
Closed

In order to fit in with the urban development and make efficient use of the site, both buildings were aligned with the street on the gable end. A small setback in the positioning allows for a front garden zone. This was intended to break through the "green wall" and implement communication with the neighborhood. Large canopies protect the entrance areas and, in combination with the garages, create

Project Information FAQ

Project Information

3 Q
The project “Set Houses with One Pillar / Buero Wagner” is an infrastructure initiative in the Road sector, located in Abler. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In order to fit in with the urban development and make efficient use of the site, both buildings were aligned with the street on the gable end. A small setback in the positioning allows for a front garden zone. This was intended to break through the "green wall" and implement communication with the neighborhood. Large canopies protect the entrance areas and, in combination with the garages, create an intermediate zone through which one can access the private flower gardens behind the two houses. The organization of the houses themselves also follows this principle: on the access side facing the street, the kitchen is arranged as a communicative space facing the neighbourhood, while the living area is oriented towards the quieter garden side. The private bedrooms and offices are located on the upper floors. The offsets in the black charred façade structure the building, but are mainly the result of the limited lengths of the wooden boards.The basement and the first floor, which is partially underground, were made of solid concrete. The concrete surfaces were sandblasted to achieve a "soft" surface - the concrete floor was sanded and sealed. The first floor is made of solid wood in keeping with regional building typologies. This creates an intimate atmosphere with warm surfaces and small rooms to retreat to. Bio-based building materials were used as insulation for the exterior walls and the roof. These are covered with charred wooden formwork. The charring process (carbonization) naturally protects the material from the weather and insects. This made it possible to dispense with chemical wood protection. The construction materials have been left largely visible. Neither concrete nor solid wood walls were clad. The floor is also monolithic and has no other superstructures or cladding - this means that, technically, unnecessary layers were largely dispensed with. The building is heated by an air heat pump in combination with a photovoltaic system and concrete core activation.Offsets in the floor and ceiling define different room zones for dining, cooking, and living. A large window extends the room into the garden, reinforcing the generous feeling of space. Some of the furnishings were designed directly in the shell. For example, the kitchen worktop was concreted directly onto one of the central pillars. This means that the construction is also used as furniture. The kitchen becomes the central and load-bearing element of the house. Built-in furniture such as the kitchen and checkroom is an integral part of the set box made of oak. The landings used as steps are also made of oak and serve as storage space. Railings and the cantilevered steps, as well as the fireplace, are, like the furniture, specially designed for the house and are made of raw oiled steel.As with the surrounding barns, the façade formwork therefore scales from top to bottom, preventing standing water on the end grain of the formwork boards. The windows of rooms requiring protection are concealed behind the narrow vertical cut-outs in the façade, protecting them from outside views. Large circular segment-shaped openings in the façade give the houses a face to the street side and create a view of the surrounding tree tops from the inside. Designed for three generations of a family, one house is occupied by the father, the other by his son with his wife and children. The houses are almost identical on the outside, but differ on the inside due to the different requirements of their occupants. The houses have a relatively small floor area of 90 square meters each. The height restriction on the ground floor and attic made it necessary to build a basement for the necessary ancillary rooms, such as technical and storage rooms. There is only one large room on the first floor, which is only supported by a single column - there are no other interior walls. A wooden box was only placed at the back to accommodate the entrance, WC, and kitchen.Text description provided by the architects.The two houses are located on Lake Starnberg in the foothills of the Alps, approximately. 20 km from Munich in Söcking. The residential area on the outskirts of Starnberg was developed in the 1950s. The buildings there are often still in their original condition, but, like many buildings from this period, they are of low quality. Their plots are generously sized at around 1000 m2 each. With Vision Starnberg 2025, an integrated urban development concept (ISEK), the intention was to restructure this neighborhood, which proposed, among other things, densification within the plots. The concept was not followed up on in 2021 for capacity reasons. Nevertheless, the procedure - an inner-local redensification - was implemented in the new buildings. Two houses were built on a plot with an existing dwelling. This created more space without developing and sealing new areas. After an initial investigation into the continued use of the existing building, it was decided to demolish the existing building and make space for two new buildings due to the poor material quality of the structure and the unfavorable central position of the building on the site. The material from the demolition was separated on site, shredded, and processed into recycled material.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data