logo

Set up a unit for a clientele presenting psychological and behavioral symptoms of dementia (BPSD) and renovate some of the obsolescence of the asset maintenance master plan

One of 10,000+ projects Taiyo tracks in Quebec.

Source: Infrastructure Canada

Project
Completed

The project will be located at the Donnacona accommodation center and it consists of carrying out functional interventions and adaptation of the environment for a clientele presenting psychological and behavioral symptoms of dementia. The work includes: replacing a section of the two-layer elastomeric roofing, replacing asphalt shingles, repairing the metal siding, repairing the insulated siding w

Status
Closed
Sector
Oil and Gas, Metal, Steel, Cement, Road
Location
Quebec, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Set up a unit for a clientele presenting psychological and behavioral symptoms of dementia (BPSD) and renovate some of the obsolescence of the asset maintenance master plan

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Set up a unit for a clientele presenting psychological and behavioral symptoms of dementia (BPSD) and renovate some of the obsolescence of the asset maintenance master plan” is an infrastructure initiative in the Oil and Gas sector, located in Quebec, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will be located at the Donnacona accommodation center and it consists of carrying out functional interventions and adaptation of the environment for a clientele presenting psychological and behavioral symptoms of dementia. The work includes: replacing a section of the two-layer elastomeric roofing, replacing asphalt shingles, repairing the metal siding, repairing the insulated siding with acrylic coating, repairing the surface of a staircase concrete, replacement of a double steel door with an insulated steel frame, replacement of windows, repair of foundation plaster, replacement of vertical plumbing, addition of a backflow preventer (DAR) , replacement of a single-phase secondary transformer (200 kVA), upgrading of fluorescent lighting fixtures (for conversion from T12 to T8) as well as dismantling of the oil reserve and elevator controller. The project will support pandemic response and economic recovery, notably by maintaining and upgrading health infrastructure.

Original sector

Community, Culture and Recreation

Location

Country

Canada

State

Quebec

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Oil and Gas, Metal, Steel, Cement, Road

Article published date

2026-05-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project