logo

Set up a unit for a clientele presenting psychological and behavioral symptoms of dementia (BPSD) and renovate some of the obsolescence of the asset maintenance master plan

Sector: Steel • Location: Quebec, Canada

Source: Infrastructure Canada

Project
Completed

The project will be located at the Donnacona accommodation center and it consists of carrying out functional interventions and adaptation of the environment for a clientele presenting psychological and behavioral symptoms of dementia. The work includes: replacing a section of the two-layer elastomeric roofing, replacing asphalt shingles, repairing the metal siding, repairing the insulated siding w

Project Information FAQ

Project Information

4 Q
The project “Set up a unit for a clientele presenting psychological and behavioral symptoms of dementia (BPSD) and renovate some of the obsolescence of the asset maintenance master plan” is an infrastructure initiative in the Steel sector, located in Quebec, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project will be located at the Donnacona accommodation center and it consists of carrying out functional interventions and adaptation of the environment for a clientele presenting psychological and behavioral symptoms of dementia. The work includes: replacing a section of the two-layer elastomeric roofing, replacing asphalt shingles, repairing the metal siding, repairing the insulated siding with acrylic coating, repairing the surface of a staircase concrete, replacement of a double steel door with an insulated steel frame, replacement of windows, repair of foundation plaster, replacement of vertical plumbing, addition of a backflow preventer (DAR) , replacement of a single-phase secondary transformer (200 kVA), upgrading of fluorescent lighting fixtures (for conversion from T12 to T8) as well as dismantling of the oil reserve and elevator controller. The project will support pandemic response and economic recovery, notably by maintaining and upgrading health infrastructure.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data