In December 2010, the Spanish company Cobra Instalaciones y Servicios S.A. was awarded in a competitive bidding process the contract to build and operate one substation located in the state of Minas Gerais. The substation was named SE Sete Lagoas 4, with planned capacity of 345/138 kV.

Besides Cobra Instalaciones y Servicios S.A., five other companies took part in the contest: Consorcio Caldas

Project Information FAQ

Project Information

5 Q
The project “Sete Lagoas Transmissora de Energia” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In December 2010, the Spanish company Cobra Instalaciones y Servicios S.A. was awarded in a competitive bidding process the contract to build and operate one substation located in the state of Minas Gerais. The substation was named SE Sete Lagoas 4, with planned capacity of 345/138 kV. Besides Cobra Instalaciones y Servicios S.A., five other companies took part in the contest: Consorcio Caldas Novas; CTEEP- Companhia de Transmissao de Energia Eletrica Paulista; TAESA- Transmissora Alianca de Energia Eletrica S.A.; Consorcio Empresarial Sete Lagoas; and ATP Engenharia Ltda. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. Cobra Instalaciones presented the lowest offer: a value of US$ 1.9 million (BRL 3.876 million), 45.08% below the ceiling set by the regulatory agency. The contract was signed in June 2011, and the sponsors created the company Sete Lagoas Transmissora de Energia Ltda to lead the project during the 30-year contract period. The sponsor committed to invest US$ 42.3 million (BRL 99.50 million) in the substation. In August 2014, the sponsor was granted a US$ 10.4 million (BRL 24.35 million) loan from state-owned bank BNDES. Environmental clearance was awarded in June 2011, and the construction works commenced right away. Commercial operations started in June 2014. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelated depreciation methods of accounting for construction expenditures.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data