SETEX 500-kV Transmission Project
Sector: Power Transmission • Location: Texas, United States
Source: Utility Dive
A 145-mile, 500-kV SETEX transmission project in Entergy’s Southeast Texas territory, approved by the Public Utilities Commission of Texas.
- Status
- Prospective
- Sector
- Power Transmission, Power Generation (CCGT), Data Center
- Location
- Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Utility Dive
ConstructChat
Ask ConstructChat about SETEX 500-kV Transmission Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 145-mile, 500-kV SETEX transmission project in Entergy’s Southeast Texas territory, approved by the Public Utilities Commission of Texas. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source | Utility Dive |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Data Center |
Article published date | 2025-11-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
