SETRAG II

Sector: Water Supply and Storage • Location: Gabon

Source: International Finance Corporation (IFC)

This Environmental and Social Review Summary (ESRS) is disclosed in anticipation of a proposed second loan to the Société d’Exploitation du Transgabonais (Setrag or the “Company”) for its 2015-2024 capital expenditure program for the Transgabonais railroad. A first loan was signed in June 2016 (# 34400), and funds were intended to support rehabilitation of the existing infrastructure (replacement

Status
Prospective
Sector
Water Supply and Storage, Mass Transit, Waste Processing and Treatment, Commercial, Rail, Road, Government
Location
Gabon
Updated
19 Nov 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about SETRAG II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SETRAG II” is an infrastructure initiative in the Water Supply and Storage sector, located in Gabon. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

This Environmental and Social Review Summary (ESRS) is disclosed in anticipation of a proposed second loan to the Société d’Exploitation du Transgabonais (Setrag or the “Company”) for its 2015-2024 capital expenditure program for the Transgabonais railroad. A first loan was signed in June 2016 (# 34400), and funds were intended to support rehabilitation of the existing infrastructure (replacement of approximately 165 km of sleepers – 102 km achieved by end of October 2019); acquisition of new rolling stock for replacement and expansion of transport capacity; refurbishment of railway stations, track bed repairs in selected unstable zones, refurbishment of workers accommodations ; drainage improvement along the rail corridor; installation of new rail awareness signage and improvement of level crossings. The proposed second facility will allow Setrag to complete the balance of works (the “Project”) estimated at a cost of €256.2 million. IFC proposed investment is an A loan of up to €59.5 million and a mobilization of €44.7 million. The incremental funding will be used to continue the work described above, plus i) replacement of 515 km of sleepers, ii) replacement of 184 km of rails, iii) building of additional safety barriers and pedestrian overpasses, and iv) upgrades to the traffic management system. Best estimates of workforce size covering all tasks is about 500 workers. Phase II is to be started in March 2020.  This project is confined to the existing 648 km railway corridor, i.e.  a safety corridor stretching 15 m on either side of the existing railway tracks plus land already acquired for other existing infrastructure. Itwill not result in any new footprint or habitat fragmentation. The legal right of way for the railway extends 40 m on either side of the centerline of the tracks, but to minimize potential social impacts on informal settlers, it has been decided to restrict the works area to the narrower safety/operational corridor.

Original sector

E-AB - Rail Transportation

Location

Country

Gabon

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Mass Transit, Waste Processing and Treatment, Commercial, Rail, Road, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project