SETRAG
Sector: Rail • Location: Gabon
Source: IFC Project Disclosures
The Project consists in a loan to the “Société d’Exploitation du Transgabonais” (“SETRAG” or the “Company”) for (i) the rehabilitation of the existing infrastructure (rail track mostly) between Libreville and Franceville (including the replacement of wood sleepers with concrete sleepers), the ultimate goal being to reduce slowdowns and double the capacity
- Status
- Prospective
- Sector
- Rail, Cement
- Location
- Gabon
- Updated
- 19 Nov 2026
- Source
- IFC Project Disclosures
ConstructChat
Ask ConstructChat about SETRAG
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Project consists in a loan to the “Société d’Exploitation du Transgabonais” (“SETRAG” or the “Company”) for (i) the rehabilitation of the existing infrastructure (rail track mostly) between Libreville and Franceville (including the replacement of wood sleepers with concrete sleepers), the ultimate goal being to reduce slowdowns and double the capacity of the line to 16 trains per day; and (ii) the acquisition of new rolling stock for the replacement and expansion of transport capacity. |
Original sector | E-AB - Rail Transportation |
Location
Country | Gabon |
Source
Source | IFC Project Disclosures |
URL |
More Details
Record type | Project |
Sector | Rail, Cement |
Article published date | 2026-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
