Setting up of 50 MW [plus/minus 5 percent] Wind Power Plant for Captive Consumption at MR

Sector: Natural Gas • Location: Nandurbar, Maharashtra, India

Source: India Investment Grid (IIG)

Project
Notice To Proceed

Economic/Social Impact of the Project BPCL planned a 50 MW wind project in Maharashtra for captive use at Mumbai Refinery [MR], leveraging the Intra State Transmission System [In STS]. The consultant engaged for DFR assessed Maharashtra wind zones and projected a CUF of 32/34 percent, where LSTK Tender was prepared considering CUF of 32 percent by the PMC engaged for the LSTK Project on a conserva

Project Information FAQ

Project Information

4 Q
The project “Setting up of 50 MW [plus/minus 5 percent] Wind Power Plant for Captive Consumption at MR” is an infrastructure initiative in the Natural Gas sector, located in Nandurbar, Maharashtra, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

notice to proceed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Economic/Social Impact of the Project BPCL planned a 50 MW wind project in Maharashtra for captive use at Mumbai Refinery [MR], leveraging the Intra State Transmission System [In STS]. The consultant engaged for DFR assessed Maharashtra wind zones and projected a CUF of 32/34 percent, where LSTK Tender was prepared considering CUF of 32 percent by the PMC engaged for the LSTK Project on a conservative side. On Domestic Competitive bidding, the Works Contract for setting up a 50.40 MW Wind Power Plant on LSTK mode for captive consumption at Mumbai Refinery [MR] in the District Nandurbar, Maharashtra has been awarded to M/s Integrum Energy Infrastructure Private Limited. Total 24 Wind Energy Generators of capacity 2.1 MW each are proposed to be installed. Power will be transmitted to Mumbai Refinary [MR] via open access, with applicable charges and losses.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data