Settling Pond & Chlorine Basin Dredging
Sector: Cement • Location: Kearneysville, West Virginia, United States of America
Source: Dodge USA
The Eastern Ecological Science Center (EESC) located in Kearneysville, WV has multiple settling ponds on site. The facility requires dredging of one settling pond and one chlorine contact tank (concrete basin). The average original depth of the settling pond is approximately 3-5 feet. Other associated work is also required, and all work is described below. Settlement Pond 3: Pond is appx. 75 w x 3
- Status
- Prospective
- Sector
- Cement, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Kearneysville, West Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Settling Pond & Chlorine Basin Dredging
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Eastern Ecological Science Center (EESC) located in Kearneysville, WV has multiple settling ponds on site. The facility requires dredging of one settling pond and one chlorine contact tank (concrete basin). The average original depth of the settling pond is approximately 3-5 feet. Other associated work is also required, and all work is described below. Settlement Pond 3: Pond is appx. 75 w x 375 l, and tapers to 20 w at one end. Original depth is 3-5 fee Dredge entire pond to remove settl... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | West Virginia |
City | Kearneysville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Commercial, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
