logo

Sevier CJC Parking Lot Expansion

Sector: Water Supply and Storage • Location: Richfield, Utah, United States of America

Source: Dodge

Project
Bidding

The Project includes the following work: Expansion of existing CJC parking lot and placement of curb and gutter, sidewalk, and landscaping including extension of existing sidewalk. Work includes concrete and landscaping removal and placement, sidewalk, concrete curb and gutter, untreated base course, asphalt paving, drainage improvements, landscaping, and incidental work. Bids will be received for

Status
Prospective
Sector
Water Supply and Storage, Cement, Government, Car parking, Commercial, Waste Processing and Treatment, Road, Automotive
Location
Richfield, Utah, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Sevier CJC Parking Lot Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sevier CJC Parking Lot Expansion” is an infrastructure initiative in the Water Supply and Storage sector, located in Richfield, Utah, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project includes the following work: Expansion of existing CJC parking lot and placement of curb and gutter, sidewalk, and landscaping including extension of existing sidewalk. Work includes concrete and landscaping removal and placement, sidewalk, concrete curb and gutter, untreated base course, asphalt paving, drainage improvements, landscaping, and incidental work. Bids will be received for a single contract.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Utah

City

Richfield

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Government, Car parking, Commercial, Waste Processing and Treatment, Road, Automotive

Article published date

2025-03-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project