SEW LSY Highway Limited
Sector: Road • Location: India
Source: World Bank Group
On 1st August 2011, the Uttar Pradesh State Highway Authority (UPSHA) signed a 25 year concession (including construction period of 30 months) with a consortium of SEW Infrastructure Limited and Prasad & Company Limited for the the strengthening,improvement, 4-laning, operation and maintenance, and tolling four laning of 206kms of Delhi- Saharanpur-Yamunotri section upto Uttarakhand Border from 1
- Status
- Prospective
- Sector
- Road, Waste Processing and Treatment, Bridge, Government, Residential, Automotive, Commercial
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about SEW LSY Highway Limited
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | On 1st August 2011, the Uttar Pradesh State Highway Authority (UPSHA) signed a 25 year concession (including construction period of 30 months) with a consortium of SEW Infrastructure Limited and Prasad & Company Limited for the the strengthening,improvement, 4-laning, operation and maintenance, and tolling four laning of 206kms of Delhi- Saharanpur-Yamunotri section upto Uttarakhand Border from 10.91 km to 217.00 km on SH-57 in the State of Uttar Pradesh. Under the contract, Gammon was responsible for the design, construction, finance, operation and maintenance and widening of the existing carriageway to a 4-lane highway with paved shoulders. The scope would include construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts, road intersections, interchanges, drains, etc. The expansion project, part of UP State Highway Development Program would ease traffic congestion and give significant stimulus to trade and commerce in the entire region. The consortium of SEW Infrastructure Limited (70%) & Prasad & Company Limited (30%), established SEW LSY Highway Limited in July 2011, a special purpose vehicle, to implement the project. The SPV won the tender through international competitive bidding, conducted by UPSHA by requesting for the lowest viability gap funding (upfront subsidy) of US$ 68mn (INR 3400mn). The SPV was to recover the capital costs and operating costs including returns through tolling during the term of concession. SEW Infrastructure Ltd was the EPC contractor of the project. The concession agreement was signed on 1st August 2011. The project attained financial closure on 17th March 2012. The grant/debt/equity ratio of the project was 12/61/26. The estimated capital cost of the project at the time of financial closure was US$ 553.3 (INR 27664.8mn @ 50 INR/USD) million. Apart from the VGF grant of INR 3400mn from GoI, the financing comprised a 14-year 9-month term loan of US$ 340mn (INR 17000mn) and sponsor equity of US$ 145.4mn (INR 7264.8mn). The 17000mn term loan had a grace period of 6 months and repayment schedule of 46 quarterly installments. The term loan was priced at PNB Base Rate plus 1.75% (Floating). The debt was arranged by SBI Capital Markets Limited.The participating banks were Punjab National Bank(3000mn), ICICI Bank Ltd(2700mn), India Infrastructure Finance Co Ltd(2400mn), Corporation Bank(1400mn), Union Bank of India(1150mn), Indian Overseas Bank (900mn), Oriental Bank of Commerce(900mn), Dena Bank Ltd(700mn), State Bank of Hyderabad(450mn), State Bank of Mysore(450mn), State Bank of Patiala(450mn), Vijaya Bank(700mn), Central Bank of India(900mn), Punjab & Sind Bank (900mn). Construction on the project began in April 2012 and was expected to be completed by September 2014. Over 90 per cent of the land required for the construction of the road project had already been made available by UPSHA. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Waste Processing and Treatment, Bridge, Government, Residential, Automotive, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in India
- Dholera Solar Park Gujarat
- Sugen 1100MW CCGT Akhakhol Gujarat
- ONGC Tripura Power Plant
- Cable-stayed bridge project in the Chambal River
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- RattanIndia Power Limited (Amravati Thermal Power Project)
- GVRMP Belgaum Khanapur Tollway Private Limited