Sewage Lagoon Revitalization - Village of Arcadia
Sector: Water Supply and Storage • Location: New Brunswick, Canada
Source: Infrastructure Canada
The Village of Arcadia operates a sewage treatment lagoon for approximately 200 residents and businesses. The lagoon went into service in 1990 and has been operating continuously since that time. The lagoon receives the raw, untreated sewage from the collection system. The aerated lagoon is divided into 3 cells and has a 30-day detention period. Treated wastewater is released at the discharge poin
- Status
- Under Construction
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Sewage Lagoon Revitalization - Village of Arcadia
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Village of Arcadia operates a sewage treatment lagoon for approximately 200 residents and businesses. The lagoon went into service in 1990 and has been operating continuously since that time. The lagoon receives the raw, untreated sewage from the collection system. The aerated lagoon is divided into 3 cells and has a 30-day detention period. Treated wastewater is released at the discharge point into the Saint River. As part of the treatment process, solids settle to the bottom of the lagoon, and these biosolids build up over time. The purpose of this project is to remove biosolids that have built up on the bottom of the lagoon, as they have now reached the point where there are impeding operation of the lagoon. Removing these biosolids will require the construction of a pad to accommodate the treatment bags, the removal of the biosolids from the bottom of the lagoon, and de-watering the biosolids through filtration bags. These de-watered solids in filtration bags will then be transported to a licensed disposal facility. |
Original sector | Drinking Water and Wastewater |
Budget |
Location
Country | Canada |
State | New Brunswick |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
