Sewage Pumping Stations Electrical Upgrades and Manual Transfer Switch Installations
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
Sewage pumping stations will be upgraded through the installation of the new electrical services and manual transfer switches with connections to a standby power unit. This is necessary due to a decision by Hydro One to eliminate the existing power and standby power that is fed from the waste water treatment plant.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Sewage pumping stations will be upgraded through the installation of the new electrical services and manual transfer switches with connections to a standby power unit. This is necessary due to a decision by Hydro One to eliminate the existing power and standby power that is fed from the waste water treatment plant. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
