Sewage treatment project in Sun Village
Sector: Water Supply and Storage • Location: China
Source: World Bank Group
The sewage treatment project of Sun Village in Liuzhou City is located in Sun Village, Liunan District, Liuzhou City. It is a municipal project and covers an area of ??111.1 mu. The designed scale of the sewage treatment plant is 3000m3/d of sewage, and a sewage pipe network of D300~D600 of 4310 meters will be built outside the plant in the near future. The production structures of the sewage trea
- Status
- Prospective
- Sector
- Water Supply and Storage, Chemical (Industrial), Government, Waste Processing and Treatment, Cement, Manufacturing (Industrial), Commercial
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Sewage treatment project in Sun Village
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The sewage treatment project of Sun Village in Liuzhou City is located in Sun Village, Liunan District, Liuzhou City. It is a municipal project and covers an area of ??111.1 mu. The designed scale of the sewage treatment plant is 3000m3/d of sewage, and a sewage pipe network of D300~D600 of 4310 meters will be built outside the plant in the near future. The production structures of the sewage treatment plant mainly include coarse grids and inlet pump rooms, fine grids, cyclone grit chambers, biological contact oxidation tanks, sedimentation tanks, flocculation tanks, double-effect filter tanks, ultraviolet disinfection tanks, constructed wetland systems, and sludge Concentrated dehydration machine room, blower room and auxiliary buildings, etc. Sewage treatment adopts biological contact oxidation process + advanced treatment process, and tail water adopts ultraviolet disinfection process. The discharge is in accordance with the first level A discharge standard specified in the "Emission Standard for Pollutants for Urban Sewage Treatment Plants" (GB18918-2002). Sewage treatment plants The sludge is mainly used for incineration to produce building materials. Total investment stands at $ 5.1 million. Type of concession is BOT with a period of 30 years. Financial close took place on July 14, 2020. https://www.cpppc.org:8082/inforpublic/homepage.html#/projectDetail/ea2ff3aa780549dc93c0ff75167edf20 |
Original sector | Water and sewerage |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Chemical (Industrial), Government, Waste Processing and Treatment, Cement, Manufacturing (Industrial), Commercial |
Article published date | 2024-09-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in China
- Three Gorges Dam Hydro Electric Power Plant China
- Taishan Nuclear Power Plant
- Tianwan Nuclear Power Plant Lianyungang
- Zhenan PumpedStorage Power Project
- Xiluodu Hydroelectric Power Plant
- Hynix China Project Clean Room Package
- Yichun Economic Development Zone Sewage Comprehensive Treatment Plant
- Baoying Waste-to-Energy plant
