Sewage treatment project in Sun Village
Sector: Water Supply and Storage • Location: China
Source: World Bank Group
The sewage treatment project of Sun Village in Liuzhou City is located in Sun Village, Liunan District, Liuzhou City. It is a municipal project and covers an area of ??111.1 mu. The designed scale of the sewage treatment plant is 3000m3/d of sewage, and a sewage pipe network of D300~D600 of 4310 meters will be built outside the plant in the near future. The production structures of the sewage trea
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The sewage treatment project of Sun Village in Liuzhou City is located in Sun Village, Liunan District, Liuzhou City. It is a municipal project and covers an area of ??111.1 mu. The designed scale of the sewage treatment plant is 3000m3/d of sewage, and a sewage pipe network of D300~D600 of 4310 meters will be built outside the plant in the near future. The production structures of the sewage treatment plant mainly include coarse grids and inlet pump rooms, fine grids, cyclone grit chambers, biological contact oxidation tanks, sedimentation tanks, flocculation tanks, double-effect filter tanks, ultraviolet disinfection tanks, constructed wetland systems, and sludge Concentrated dehydration machine room, blower room and auxiliary buildings, etc. Sewage treatment adopts biological contact oxidation process + advanced treatment process, and tail water adopts ultraviolet disinfection process. The discharge is in accordance with the first level A discharge standard specified in the "Emission Standard for Pollutants for Urban Sewage Treatment Plants" (GB18918-2002). Sewage treatment plants The sludge is mainly used for incineration to produce building materials. Total investment stands at $ 5.1 million. Type of concession is BOT with a period of 30 years. Financial close took place on July 14, 2020. https://www.cpppc.org:8082/inforpublic/homepage.html#/projectDetail/ea2ff3aa780549dc93c0ff75167edf20 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
