Sewage treatment project in Wei Town
One of 10,000+ projects Taiyo tracks in China.
Source: World Bank Group
The construction content includes the sewage treatment project in Wei Town and the rural sewage treatment project. Among them, the sewage treatment project in Wei Town includes: 13 new domestic sewage treatment plants and supporting pipe networks in Wei Town, with a total design scale of 15,155 tons per day and a total pipe network length of about 125.44 kilometers; two sewage treatment facilities
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Transmission, Government, Waste Processing and Treatment, Power Generation (CCGT), Commercial
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Sewage treatment project in Wei Town
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The construction content includes the sewage treatment project in Wei Town and the rural sewage treatment project. Among them, the sewage treatment project in Wei Town includes: 13 new domestic sewage treatment plants and supporting pipe networks in Wei Town, with a total design scale of 15,155 tons per day and a total pipe network length of about 125.44 kilometers; two sewage treatment facilities in Wei Town have been built. The total scale of upgrading and transformation is 2500 tons/day, and the total pipeline network length is about 13 kilometers; the sewage treatment scale of Fushi Township has been built 250 tons/day, and the supporting pipeline network length is about 950 meters. Rural sewage treatment projects include: new construction of 14 rural domestic sewage treatment facilities and supporting pipe networks, with a total design scale of 1,400 tons/day and a pipe network length of about 19.2 kilometers; the sewage treatment facilities of Huangtian Village, Hengzhai Township, have been built with 150 tons/day, supporting facilities The length of DN300 pipe network is about 1662 meters, and the length of DN200 pipe network is 171 meters. Concession type is BOT with a period of 22 years. Total investment stands at $ 57.6 million. Financial close took place on April 20, 2021. https://www.cpppc.org:8082/inforpublic/homepage.html#/projectDetail/715289073b274644a4cb283e19e68088 |
Original sector | Water and sewerage |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Government, Waste Processing and Treatment, Power Generation (CCGT), Commercial |
Article published date | 2024-09-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in China
- Yangjiang Nuclear Power Plant Guangdong Province
- Shidao Bay Nuclear Power Plant
- Sanmen Nuclear Power Plant Zhejiang Province
- Baihetan Hydropower Project China
- The Ertan China Hydropower Plant Project
- Yebatan Hydropower Project
- Qinshan Nuclear Power Plant Haiyan County Zhejiang
- Lingao Nuclear Power Station Guangdong
