Sewage Treatment Systems Replacement
Sector: Water Supply and Storage • Location: Murphysboro, Illinois, United States of America
Source: Dodge USA
A. DESCRIPTION: Project base bid includes modification and replacement to the existing sanitary sewer treatment facility. The existing RV dump station located at the facility will be removed and replaced. Existing sanitary sewer utilities located throughout the park at other locations will be replaced and connected to the new treatment facility. B. EXISTING CONDITIONS: Project is located in Lake M
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | A. DESCRIPTION: Project base bid includes modification and replacement to the existing sanitary sewer treatment facility. The existing RV dump station located at the facility will be removed and replaced. Existing sanitary sewer utilities located throughout the park at other locations will be replaced and connected to the new treatment facility. B. EXISTING CONDITIONS: Project is located in Lake Murphysboro State Park. The current onsite sanitary sewer treatment facility is inoperable, requir... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
