logo

Sewer Gravity Main Repair

Sector: Water Supply and Storage • Location: Palm Coast, Florida, United States of America

Source: Dodge

Project
Bidding

The City of Palm Coast is seeking bids from qualified contractors to replace 30 feet of 8-inch sewer pipe on Putter Drive at a depth of approximately 7 feet. The project, located at 24.544607, -81.230546, includes excavation, full pavement restoration, and replacing the road base with OPTIONAL BASE, BASE GROUP 09 and pavement with Asphalt Concrete Friction Course, Traffic C, FC-9.5, PG 76-22, 1.5"

Status
Prospective
Sector
Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Cement, Government
Location
Palm Coast, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Sewer Gravity Main Repair

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sewer Gravity Main Repair” is an infrastructure initiative in the Water Supply and Storage sector, located in Palm Coast, Florida, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The City of Palm Coast is seeking bids from qualified contractors to replace 30 feet of 8-inch sewer pipe on Putter Drive at a depth of approximately 7 feet. The project, located at 24.544607, -81.230546, includes excavation, full pavement restoration, and replacing the road base with OPTIONAL BASE, BASE GROUP 09 and pavement with Asphalt Concrete Friction Course, Traffic C, FC-9.5, PG 76-22, 1.5" on a single-access roadway

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Palm Coast

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Cement, Government

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project