Sewer Lagoon Upgrade
Pre-construction · Newfoundland and Labrador
Source: Infrastructure Canada
The scope of the project will consist of 3 new compressor pumps (blowers); 30 new static aerators; MIS Piping/fittings; Bypass rentals and holding tanks during the duration of the lagoon upgrades; removal of existing sewage in the lagoon(dispose/treat as per regulations)and installation of a new permanent holding cell. This project will also include shipping of supplies and labor cost for the upgr
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage
- Location
- Newfoundland and Labrador, Canada
- Updated
- 19 Nov 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Sewer Lagoon Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The scope of the project will consist of 3 new compressor pumps (blowers); 30 new static aerators; MIS Piping/fittings; Bypass rentals and holding tanks during the duration of the lagoon upgrades; removal of existing sewage in the lagoon(dispose/treat as per regulations)and installation of a new permanent holding cell. This project will also include shipping of supplies and labor cost for the upgrade. The majority of this project cost is due to the methodology of bypassing the sewage system. The sewage lagoon is located near the Humber River therefore the bypass system needs to be taken into account. This cost avoids a major environmental impact to the local salmon river. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Wood Buffalo Wastewater Treatment Plant
- Acden Corporate Headquarters and Fleet Facility
- Wastewater Treatment Lagoon and Collection System Improvements
- Elie Lagoon RipRap Upgrade
- Altona / Rhineland Waste Disposal Ground Expansion
- Treherne Water & Sewer Main Renewal
- Broadway and Mountain Backlane Sewer and Water Replacement Project
- Mountain Avenue and Broadway and Mountain Backlane Sewer and Water Replacement - Phase II
