Sewer Lining Installing
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The installation of approximately 22,331 linear feet of 8 and 10 cured-in-place pipe (CIPP). After liner has cured, Contractor will reconnect all lateral connections. Other work includes any by-pass pumping required for the pipe lining, traffic control and other items incidental to this type of construction.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Highland, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sewer Lining Installing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The installation of approximately 22,331 linear feet of 8 and 10 cured-in-place pipe (CIPP). After liner has cured, Contractor will reconnect all lateral connections. Other work includes any by-pass pumping required for the pipe lining, traffic control and other items incidental to this type of construction. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Highland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
