logo
ProjectClosed

Sewer Main Improvements

Closed · New Hampshire · Last reported Apr 2023

Source: Dodge USA

Separate sealed BIDS for the construction of: Replacement of Leach Field #1: Remove all existing leach fields, tanks and all other existing components within the area where the new leach fields will be constructed. Construct (2) stone and pipe butterfly leach fields including all tanks, piping, distribution boxes, Advanced Onsite System, and pump station reconfiguration. Flush and clean 960 of 6 s

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Commercial
Location
Barrington, New Hampshire, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Sewer Main Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sewer Main Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in Barrington, New Hampshire, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Separate sealed BIDS for the construction of: Replacement of Leach Field #1: Remove all existing leach fields, tanks and all other existing components within the area where the new leach fields will be constructed. Construct (2) stone and pipe butterfly leach fields including all tanks, piping, distribution boxes, Advanced Onsite System, and pump station reconfiguration. Flush and clean 960 of 6 sewer main and replace 350 lf sewer main

Procurement method

Budget

Location

Country

United States of America (USA)

State

New Hampshire

City

Barrington

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Commercial

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project