Sewer Main Lining
Sector: Waste Processing and Treatment • Location: Newfoundland and Labrador, Canada
Source: Infrastructure Canada
The scope of the Sewer Main Lining project is to rehabilitate the existing sewer mains in the Goulds area of the City to improve the structural integrity of the pipes and to reduce the amount of water entering the collection system by inflow and infiltration. The Project will utilize trenchless techniques to install approximately 2,700 meters of structural sewer main liner in the existing sewer pi
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial
- Location
- Newfoundland and Labrador, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Sewer Main Lining
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of the Sewer Main Lining project is to rehabilitate the existing sewer mains in the Goulds area of the City to improve the structural integrity of the pipes and to reduce the amount of water entering the collection system by inflow and infiltration. The Project will utilize trenchless techniques to install approximately 2,700 meters of structural sewer main liner in the existing sewer pipes. In addition, repair or replacement of sections of pipe by traditional excavation methods will be required to correct some deficiencies noted in the Goulds Wastewater Monitoring Study. It is anticipated the project would extend the life of the existing wastewater collection system for up to 100 years. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
