Sewer Main Replacement
Sector: Water Supply and Storage • Location: Harrah, Oklahoma, United States of America
Source: Dodge USA
Section 4 (Line L from Station 79+01.82 to Station 93+73.77) 1,471.97 L.F. 18" PVC ASTM F679 Sewer Main 1,371.97 L.F. Excavation and Backfill (0'-15') 100.00 L.F. Install 24" Steel Casing 3/8" Thk. With Spacers and Grout 2.00 Ea. Concrete Collar 2.00 Ea. Type 1 Concrete Pier 6.00 Ea. 4' Dia. Manhole 11.86 V.F. Extra Depth Manhole Section 5 (Line L from Station 93+73.77 to Station 112+25.58) 1,852.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Section 4 (Line L from Station 79+01.82 to Station 93+73.77) 1,471.97 L.F. 18" PVC ASTM F679 Sewer Main 1,371.97 L.F. Excavation and Backfill (0'-15') 100.00 L.F. Install 24" Steel Casing 3/8" Thk. With Spacers and Grout 2.00 Ea. Concrete Collar 2.00 Ea. Type 1 Concrete Pier 6.00 Ea. 4' Dia. Manhole 11.86 V.F. Extra Depth Manhole Section 5 (Line L from Station 93+73.77 to Station 112+25.58) 1,852.24 L.F. 15" PVC SDR 26 Sewer Main 1,852.24 L.F. Excavation and Backfill (0'-15') 6.00 Ea. 4' Dia.... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
