Sewer Outfall Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Constructing approximately 4,570 LF of 10 gravity sewer main and 30 manholes along with the necessary service reconnections. The improvements will be within existing SCDOT right of way and easements. All of the upgrades will be done via open-cut trenching. The Northside pump station rebuild will be bid as an alternative to this project. Its scope has been broken out into alternates. The Bank pump
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Government, Commercial
- Location
- Heath Springs, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sewer Outfall Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Constructing approximately 4,570 LF of 10 gravity sewer main and 30 manholes along with the necessary service reconnections. The improvements will be within existing SCDOT right of way and easements. All of the upgrades will be done via open-cut trenching. The Northside pump station rebuild will be bid as an alternative to this project. Its scope has been broken out into alternates. The Bank pump station electrical upgrades will be bid as an alternate to this project and includes all new elec... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Heath Springs |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
