Sewer Rehab Phase 2
Sector: Forest Products and Packaging • Location: Dracut, Massachusetts, United States of America
Source: Dodge USA
The project includes the cured-in-place lining of 5,075 linear feet of 24-inch diameter cross-country sewers, bypass pumping, service grouting or pre-lining if needed, tree/brush clearing, timber mat installation and all else incidental to complete the project
- Status
- Closed
- Sector
- Forest Products and Packaging, Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Dracut, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sewer Rehab Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes the cured-in-place lining of 5,075 linear feet of 24-inch diameter cross-country sewers, bypass pumping, service grouting or pre-lining if needed, tree/brush clearing, timber mat installation and all else incidental to complete the project |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dracut |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects in United States of America
- CS 572/OAK STREET FROM REYNOLDS STREET TO BURNS STREET - TIA
- CR 29/OLD WEST POINT ROAD @ CHATTAHOOCHEE RIVER TRIB
- BUILDING PAPER, SIDING TRIM, DECK COATING INSTALL NEW GSM FL ASHING AT TRELLIS TOP BEAM, SHARES PLANS W/202202613
- BUILDING PAPER, SIDING TRIM, DECK COATING INSTALL NEW GSM FL ASHING AT TRELLIS TOP BEAM, SHARES PLANS W/202202614
- GLENWOOD-LUMBER CITY ROAD
- CALHOUN STREET FROM JONES STREET TO S OF JONES STREET - TIA
- JOHNSON STREET IN LUMBER CITY - TIA
- HELEN STREET IN LUMBER CITY
