logo

Sewer Relining Program Acceleration - Design and Construction

Sector: Waste Processing and Treatment • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Project is rehabilitation and lining of about 360m of existing 750mm sanitary trunk sewer located between Carling Arena (675 Grosvenor St) and Adelaide Street N, and Wallace St and St. James (North and South). This sewer is in poor condition and lining presents a cost effective alternative to replacement. The sewer runs through the rear yards of numerous properties with no access from the street f

Project Information FAQ

Project Information

3 Q
The project “Sewer Relining Program Acceleration - Design and Construction” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Project is rehabilitation and lining of about 360m of existing 750mm sanitary trunk sewer located between Carling Arena (675 Grosvenor St) and Adelaide Street N, and Wallace St and St. James (North and South). This sewer is in poor condition and lining presents a cost effective alternative to replacement. The sewer runs through the rear yards of numerous properties with no access from the street for equipment. Inaccessible for a large portion so little maintenance over the years has led to buildup of debris and calcite, resulting in capacity loss. This work will require Maintenance Hole (MH) modifications to allow for liner to be installed. One MH is in a rear yard on private property. Other rear yard MH’s will be lined through it will be necessary to bury a by-pass pipe in a couple of spots half way across Adelaide and run the main by-pass pipe down the middle lanes of Adelaide St from Wallace St to St James St. This will require the closing of the north and southbound passing lanes for the duration of the lining (one lane of traffic to remain in each direction). The eligible costs are limited to public/municipal property and assets.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data