Sewer Replacement
Sector: Water Supply and Storage • Location: Forest City, North Carolina, United States of America
Source: Dodge
Scope of work will consist of renovations and modernization of existing project and includes, but is not limited to, the following items: 1. Provide existing utility locating on all areas of construction/disturbance, both public and private land by calling 811. 2. Provide new 4 diameter precast concrete manholes with rims, 8 DR-35 PVC sewer main & 6 SCH 40 service laterals to all buildings, as ind
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Residential, Power Transmission, Power Generation (CCGT), Cement, Government
- Location
- Forest City, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sewer Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of work will consist of renovations and modernization of existing project and includes, but is not limited to, the following items: 1. Provide existing utility locating on all areas of construction/disturbance, both public and private land by calling 811. 2. Provide new 4 diameter precast concrete manholes with rims, 8 DR-35 PVC sewer main & 6 SCH 40 service laterals to all buildings, as indicated on the drawings, at Forest City Housing Authority multi- family site: Amity Apartments. 3.... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Forest City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Residential, Power Transmission, Power Generation (CCGT), Cement, Government |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
