Sewer Separation and Infrastructure Renewal - Planning and design for future projects and construction of one high priority project
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
This project will accelerate the design phase of projects for the replacement of combined sewers with separated sewers and replace water mains where required - Wistow St, Waterloo St., Talbot Ave. By completing the design project now, including public engagement as most of these are in the downtown core area, the City will be able to separate these combined sewers and reduce overflows to the Tham
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project will accelerate the design phase of projects for the replacement of combined sewers with separated sewers and replace water mains where required - Wistow St, Waterloo St., Talbot Ave. By completing the design project now, including public engagement as most of these are in the downtown core area, the City will be able to separate these combined sewers and reduce overflows to the Thames River much earlier than planned. These projects will support the phosphorous reduction strategies for Lake Erie by reducing bypasses and overflows to the Thames River watershed. The project will also include construction on Wistow Street, which has been identified as a high priority need for immediate construction. This project along with a few future projects will allow the decommissioning the Paardeberg Sanitary Pumping Station. Elimination of this pump station will result in a reduction of sanitary overflows as well as energy savings. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
