Sewer Separation Program Acceleration -Design and Construction
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
Design and construction for the replacement of combined sewers with sanitary sewers where required, and for the replacement of water mains. - Frances Street - 425 m, 52 customers (replace 100 mm water main and 200 mm concrete sanitary sewer; install new storm sewers to separate combined flows), plus an additional 120m, including a trenchless railway crossing to replace sanitary sewer which was req
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Design and construction for the replacement of combined sewers with sanitary sewers where required, and for the replacement of water mains. - Frances Street - 425 m, 52 customers (replace 100 mm water main and 200 mm concrete sanitary sewer; install new storm sewers to separate combined flows), plus an additional 120m, including a trenchless railway crossing to replace sanitary sewer which was required to accommodate proper sewer gradient - Rue Margaret - 330 m, 38 customers (replace 200 mm water main and 200 mm sanitary sewer; install new storm sewers to separate combined flows) - Rue Ethel - 100 m, 0 customers (remove old water main, replace 300 mm sanitary sewer, install new sewers to separate combined flows) - Avenue Elworthy - 440 m, 35 customers (replace 200 mm water main, 200 mm and 250 mm sanitary sewer; undersized 200 mm and 375 mm storm sewer) - Franklin Avenue - 275 m, 30 customers (replace 150 mm water main; 200 mm sanitary sewer; 250 mm storm sewer that is undersized and does not cover the entire street) - Rue Grosvenor - 490 m, 63 customers (replace multi-size water main and 200 mm and 250 mm sanitary sewer; install new sewers to separate combined flows). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
