Sewer System Improvements Phase 1
Sector: Water Supply and Storage • Location: Abingdon, Virginia, United States of America
Source: Dodge USA
.The Project includes the following Work:Division 1 - Installation of UV-cured CIPP liner throughout approximately 3,655LF of sewer line ranging in size from 8 to 18 diameter, the rehabilitationof 140 VF of manhole structure, repairs made to the mainline at 31 locations asshown on the plans, the reconnection and rehabilitation of approximately 72private lateral sewer lines 1,100 LF and sewer clean
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial
- Location
- Abingdon, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sewer System Improvements Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | .The Project includes the following Work:Division 1 - Installation of UV-cured CIPP liner throughout approximately 3,655LF of sewer line ranging in size from 8 to 18 diameter, the rehabilitationof 140 VF of manhole structure, repairs made to the mainline at 31 locations asshown on the plans, the reconnection and rehabilitation of approximately 72private lateral sewer lines 1,100 LF and sewer cleanouts, and locating,raising, and rehabilitation of 1 manhole, and all associated asphalt and curba... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Abingdon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
