Sewer System Improvements Phase III
Sector: Water Supply and Storage • Location: Rocky Mount, Missouri, United States of America
Source: Dodge USA
Scope - The project consists of approximately 185 new residential connections and the regionalization of the Timber Lake Village HOA consisting of 140 condos and townhomes. The collection system will include 103 grinder pump stations and a pressurized forcemain system for a total of 54,260 plus or minus of 1 to 6 small diameter pressure line. The connections are located mainly along the shoreline
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Scope - The project consists of approximately 185 new residential connections and the regionalization of the Timber Lake Village HOA consisting of 140 condos and townhomes. The collection system will include 103 grinder pump stations and a pressurized forcemain system for a total of 54,260 plus or minus of 1 to 6 small diameter pressure line. The connections are located mainly along the shoreline of Lake of the Ozarks. The second part of the project will include improving at the WWTF with the... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
