Sewer System Improvements Phase III
Closed · Missouri · Last reported Aug 2024
Source: Dodge USA
Scope - The project consists of approximately 185 new residential connections and the regionalization of the Timber Lake Village HOA consisting of 140 condos and townhomes. The collection system will include 103 grinder pump stations and a pressurized forcemain system for a total of 54,260 plus or minus of 1 to 6 small diameter pressure line. The connections are located mainly along the shoreline
- Status
- Closed
- Sector
- Forest Products and Packaging, Waste Processing and Treatment, Residential, Water Supply and Storage, Government, Commercial
- Location
- Rocky Mount, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sewer System Improvements Phase III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The project consists of approximately 185 new residential connections and the regionalization of the Timber Lake Village HOA consisting of 140 condos and townhomes. The collection system will include 103 grinder pump stations and a pressurized forcemain system for a total of 54,260 plus or minus of 1 to 6 small diameter pressure line. The connections are located mainly along the shoreline of Lake of the Ozarks. The second part of the project will include improving at the WWTF with the... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Rocky Mount |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Waste Processing and Treatment, Residential, Water Supply and Storage, Government, Commercial |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects in United States of America
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- CS 560/PINE STREET IN LUMBER CITY - TIA
- RENWICK STREET FROM W RAILROAD STREET TO JONES STREET - TIA
- Paper Work
- 2501 Garden Highway Garage
- CR 473/SWAMP ROAD @ GUM SWAMP
- CR 265/PAPER MILL RD FM CR 244/SPRING LAKE TO CS 967/EZZARD
- Cooperative Agreement for Odometer Fraud Investigations
