Sewer System Improvements
Sector: Water Supply and Storage • Location: Christiana, Tennessee, United States of America
Source: Dodge
consisting of the installation of approximately 4,800 Linear feet of 4 force main, construction of a new dosing tank, UV disinfection building with electrical and controls, 70,690 LF of drip disposal line 3.72 acres and other modifications as shown for the Eagle Creek Treatment facility and the installation of approximately 42,200 LF 2.2 acres of drip disposal lines including valves and controls m
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | consisting of the installation of approximately 4,800 Linear feet of 4 force main, construction of a new dosing tank, UV disinfection building with electrical and controls, 70,690 LF of drip disposal line 3.72 acres and other modifications as shown for the Eagle Creek Treatment facility and the installation of approximately 42,200 LF 2.2 acres of drip disposal lines including valves and controls modifications for the Diamond Crest Treatment Facility in Rutherford County, TN. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
