logo
ProjectClosed

Sewer System Master Plan Year 5 I/I Construction Phase

Closed · New Hampshire · Last reported Jul 2025

Source: Dodge

The project consists of installation of 11,164 If of structural cured-in-place pipe and reinstatement of active service connections, installation of 26 If of structural cured-in-place short liner, cutting of 14 protruding service connections, television inspection and grouting of 12 service connections, cementitious lining of 621 vf of manholes, chemical root treatment 1,544 If of sewer pipe, chem

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Chemical (Industrial), Manufacturing (Industrial), Government, Commercial
Location
Rochester, New Hampshire, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Sewer System Master Plan Year 5 I/I Construction Phase

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sewer System Master Plan Year 5 I/I Construction Phase” is an infrastructure initiative in the Water Supply and Storage sector, located in Rochester, New Hampshire, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of installation of 11,164 If of structural cured-in-place pipe and reinstatement of active service connections, installation of 26 If of structural cured-in-place short liner, cutting of 14 protruding service connections, television inspection and grouting of 12 service connections, cementitious lining of 621 vf of manholes, chemical root treatment 1,544 If of sewer pipe, chemical root treatment of 1 manhole, and other related tasks.

Procurement method

Budget

Location

Country

United States of America (USA)

State

New Hampshire

City

Rochester

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Chemical (Industrial), Manufacturing (Industrial), Government, Commercial

Article published date

2025-07-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project