Sewer System Master Plan Year 5 I/I Construction Phase
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The project consists of installation of 11,164 If of structural cured-in-place pipe and reinstatement of active service connections, installation of 26 If of structural cured-in-place short liner, cutting of 14 protruding service connections, television inspection and grouting of 12 service connections, cementitious lining of 621 vf of manholes, chemical root treatment 1,544 If of sewer pipe, chem
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Chemical (Industrial), Waste Processing and Treatment, Manufacturing (Industrial), Commercial
- Location
- Rochester, New Hampshire, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sewer System Master Plan Year 5 I/I Construction Phase
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of installation of 11,164 If of structural cured-in-place pipe and reinstatement of active service connections, installation of 26 If of structural cured-in-place short liner, cutting of 14 protruding service connections, television inspection and grouting of 12 service connections, cementitious lining of 621 vf of manholes, chemical root treatment 1,544 If of sewer pipe, chemical root treatment of 1 manhole, and other related tasks. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Hampshire |
City | Rochester |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Chemical (Industrial), Waste Processing and Treatment, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
