Sewer System Phase 6A
Sector: Water Supply and Storage • Location: Newfoundland and Labrador, Canada
Source: Infrastructure Canada
The scope of the project includes the installation of 820 m of sanitary sewer main, 29 services and 240 m of force main along Springhill Drive and Spruce Grove Road. Sanitary sewer from these areas will be treated at the town’s existing primary treatment system which has the design capacity. The project aims to increase the reliability of the sewer system for this portion of town.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government
- Location
- Newfoundland and Labrador, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Sewer System Phase 6A
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of the project includes the installation of 820 m of sanitary sewer main, 29 services and 240 m of force main along Springhill Drive and Spruce Grove Road. Sanitary sewer from these areas will be treated at the town’s existing primary treatment system which has the design capacity. The project aims to increase the reliability of the sewer system for this portion of town. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government |
Article published date | 2025-07-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
