Sewer System Pipeline Rehabilitation Phase 5
Sector: Water Supply and Storage • Location: Fairfield, Connecticut, United States of America
Source: Dodge
The Town of Fairfield (Town) on behalf of its Department of Public Works (DPW) and Water Pollution Control Authority (WPCA) is seeking competitive bids from qualified contractors to conduct gravity sewer pipe rehabilitation and repairs
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Commercial
- Location
- Fairfield, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sewer System Pipeline Rehabilitation Phase 5
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Town of Fairfield (Town) on behalf of its Department of Public Works (DPW) and Water Pollution Control Authority (WPCA) is seeking competitive bids from qualified contractors to conduct gravity sewer pipe rehabilitation and repairs |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Fairfield |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
