Sewer System Pipeline Replacement Phase 7
Closed · California · Last reported Dec 2023
Source: Dodge USA
The project work is generally described as: PHASE 7: the replacement of 16,540 linear feet of 6 and 8-inch vitrified clay pipe (VCP) with 8-inch high density polyethylene pipe (HDPE); 1,344 linear feet of 8-inch VCP with 10- inch HDPE pipe; 324 linear feet of 10-inch VCP with 12-inch HDPE pipe; 614 linear feet of 12-inch VCP with 14-inch HDPE pipe; 174 linear feet of 14-inch VCP with 16-inch HDPE
- Status
- Closed
- Sector
- Chemical (Industrial), Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial)
- Location
- San Lorenzo, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sewer System Pipeline Replacement Phase 7
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project work is generally described as: PHASE 7: the replacement of 16,540 linear feet of 6 and 8-inch vitrified clay pipe (VCP) with 8-inch high density polyethylene pipe (HDPE); 1,344 linear feet of 8-inch VCP with 10- inch HDPE pipe; 324 linear feet of 10-inch VCP with 12-inch HDPE pipe; 614 linear feet of 12-inch VCP with 14-inch HDPE pipe; 174 linear feet of 14-inch VCP with 16-inch HDPE pipe; and the reconnection of all laterals and re-channelization of all manholes, as shown on the... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Lorenzo |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Chemical (Industrial), Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Chemical (Industrial) projects in United States of America
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- Camden Street Drain Replacement
- City of Manassas Water Treatment Plant Clearwell No. 2
- Discovery Park Chemical Toilet Replacement
- Contract for the Orinda Water Treatment Plant Disinfection and Chemical Systems Safety Improvements Project in Orinda, California (United States)
- SR 1; SR 53 & SR 341 @ 8 LOCS IN FLOYD & WALKER COUNTY
- BRIDGE PRESERVATION @ 11 SR LOCS IN DISTRICT 3
- I-75 @ 1 LOC;I-85 @ 2 LOC & I-285 @1 LOC-BRIDGE PRESERVATION
