logo
ProjectBid Results

Sewer System Rehabilitation Phase 3

Bid results · Tennessee · Last reported Nov 2024

Source: Dodge USA

Scope of work : The Project consists of the following major elements: *Cleaning and CCTV of approximately 14,770 L.F. of 6-inch thru 18-inch gravity sewer line. * Renovation of approximately 14,770 L.F. of 6-inch thru 18-inch gravity sewer line using CIPP methods. * Approximately 35 open cut point repairs, and approximately 5 trenchless point repairs. * CCTV of approximately 260 sewer service late

Status
Closed
Sector
Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
Location
Paris, Tennessee, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Sewer System Rehabilitation Phase 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sewer System Rehabilitation Phase 3” is an infrastructure initiative in the Water Supply and Storage sector, located in Paris, Tennessee, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Scope of work : The Project consists of the following major elements: *Cleaning and CCTV of approximately 14,770 L.F. of 6-inch thru 18-inch gravity sewer line. * Renovation of approximately 14,770 L.F. of 6-inch thru 18-inch gravity sewer line using CIPP methods. * Approximately 35 open cut point repairs, and approximately 5 trenchless point repairs. * CCTV of approximately 260 sewer service laterals. * Renovation of approximately 211 vertical feet of existing manholes. * Installation of app...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Tennessee

City

Paris

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Commercial, Waste Processing and Treatment

Article published date

2024-11-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project