Sewer Trunk Rehabilitation on Grimes Mercy and Woodland Ave
Bid results · California · Last reported Jan 2025
Source: Dodge
The Contractor shall furnish all labor, materials and equipment necessary to complete the work as shown in the Contract Documents. All incidental work not shown in the Contract Documents which is necessary to complete the work necessary to provide the system described, or shown, shall be furnished and installed as part of this contract at no additional cost to the City. B. The Contractor shall ins
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Manufacturing (Industrial)
- Location
- Modesto, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sewer Trunk Rehabilitation on Grimes Mercy and Woodland Ave
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Contractor shall furnish all labor, materials and equipment necessary to complete the work as shown in the Contract Documents. All incidental work not shown in the Contract Documents which is necessary to complete the work necessary to provide the system described, or shown, shall be furnished and installed as part of this contract at no additional cost to the City. B. The Contractor shall inspect the site to observe actual working conditions and restrictions. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Modesto |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Manufacturing (Industrial) |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
