Sewer Utility Project No. 94
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Construction of Stormwater Improvements and Related Items. Work shall consist of approximately 2,200 cubic yards of unclassified excavation; 1,400 tons of riprap; 2,600 SY of seeding, mulching, and erosion control blanket; and related items.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT)
- Location
- Bismarck, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sewer Utility Project No. 94
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of Stormwater Improvements and Related Items. Work shall consist of approximately 2,200 cubic yards of unclassified excavation; 1,400 tons of riprap; 2,600 SY of seeding, mulching, and erosion control blanket; and related items. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Bismarck |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT) |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
