Seymour Athletic Fields New & Maintenance Building
Sector: Road • Location: Apex, North Carolina, United States of America
Source: Dodge USA
This project replaces the current Operation and Maintenance Building with a 2-story 30,000 square foot office with a warehouse and sign shop and adds a 2-acre yard with staff parking to Town owned property on the eastern side of Evans Road. The existing Maintenance Building has continuing moisture issues and the department has outgrown the space. This new Operations and Maintenance Building will h
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Pre-Design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project replaces the current Operation and Maintenance Building with a 2-story 30,000 square foot office with a warehouse and sign shop and adds a 2-acre yard with staff parking to Town owned property on the eastern side of Evans Road. The existing Maintenance Building has continuing moisture issues and the department has outgrown the space. This new Operations and Maintenance Building will have both storage space requires for the Operations team as well as office space for the expanding... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Road projects in United States of America
- Bothell Everett Highway Overlay Project
- 102nd Ave NE Downtown Access Improvements
- Beardslee Blvd Widening
- 228th St SE Overlay (2nd Ave SE to 9th Ave SE) Project
- 2023 Citywide Pedestrian Safety Improvements Project
- NE 188th St Non-Motorized Improvements
- 2019-ADA Curb Ramps
- NE 185th St Utility Improvements Project
