SFMTA Bancroft Facility Improvement Project

Sector: Car parking • Location: San Francisco, California, United States of America

Source: SFMTA Projects

Project

SFMTA Bancroft Facility Improvement Project Share this: Facebook Twitter LinkedIn Project Introduction The SFMTA is upgrading its field operations facility located at 1508 Bancroft Avenue. The goal of the project is to make it safer, more energy efficient and more sustainable in order to provide a better transportation system to all communities within San Francisco. 1508 Bancroft Facility is a two

Project Information FAQ

Project Information

3 Q
The project “SFMTA Bancroft Facility Improvement Project” is an infrastructure initiative in the Car parking sector, located in San Francisco, California, United States of America. Taiyo aggregates data on it from SFMTA Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

SFMTA Bancroft Facility Improvement Project Share this: Facebook Twitter LinkedIn Project Introduction The SFMTA is upgrading its field operations facility located at 1508 Bancroft Avenue. The goal of the project is to make it safer, more energy efficient and more sustainable in order to provide a better transportation system to all communities within San Francisco. 1508 Bancroft Facility is a two story pre-engineered metal building, constructed in 2000, formerly used as a furniture warehouse and sales office. The building currently houses the SFMTA’s sign and meter shops, sign shop vehicular parking, a loading dock and various offices. Substantial tenant improvements were made by the former building owner before it was purchased by the SFMTA in 2012. However more system improvements are necessary to provide an efficient, comfortable and safe work environment. The proposed project involves the following improvements. HVAC ( Heating, ventilation and air conditioning ) Upgrades: • Add new HVAC units to mitigate temperature swings in offices, sign and meter shop areas. • Add code required supply and exhaust to welding and machine shop areas Vertical Transport (Freight Elevators) Upgrades: • Replace existing the two-post system with a four-post system for stability under uneven loads and improved reliability. • Increase load capacity from 2,500 to 10,000 lbs for the freight elevator. A separate elevator exists for personnel. Lighting & Electrical Upgrade: • Improve warehouse type lighting to create safe, energy efficient, glare-free work lighting in regularly occupied areas. Roof Waterproofing and Insulation: • Add spray foam insulation for code compliance and energy performance. Recoat/waterproof existing metal roof: • Add skylights for daylighting energy savings and improvement in work environment by introduction of natural light Solar Panels • Add 125 Kilowatt system with the objective of reducing net overall building grid energy use Lateral Loading: • Calculations for purlins, roof loads (insulation, sprinklers, lighting, mechanical, skylights, etc.) added to structure • Replace existing brace frames on first floor to improve lateral performance of structure Interior Acoustics: • Add sound insulation between offices, sound absorptive material to walls; caulk at ceilings. Perimeter Openings • Add new band of translucent corrugated panels above (e) bands at exterior walls for daylighting energy savings and improvement in work environment by introduction of natural light. • Replace existing translucent panels Project Benefits More energy efficient mechanical and electrical components that will lessen the buildings carbon footprint. Improved ventilation and air quality that will improve the quality of workspace for the MTA staff Improving the structural system, making the building safer in the event of an earthquake Improved vertical transportation, improving work efficiency Increased amount of daylighting to improve energy efficiency and improve work place experience. Addition of solar panels to provide renewable energy source for facility. Though the immediate project benefits impact primarily the MTA staff of the building, the upgrades allow Mitigations for Possible Impacts SFMTA will implement and enforce dust and noise control measures as required per our standard construction specifications and City ordinances. All construction activities will be occurring within the site property lines and should not disrupt the traffic lanes of the streets adjacent to the project. However there may be noise and dust that result from construction work that can extend to the surrounding community. Contact Information Tess Kavanagh tess.kavanagh@sfmta.com Jay Lu jay.lu@sfmta.com

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data