SFO 'Plot 2' Runway Realignment | Wet Utilities

Sector: Airport • Location: California, United States of America (USA)

Source: Anvil Builders

Project

Recent studies of San Francisco’s International Airport led to a redesign of certain runways in order to improve overall operating efficiency. The runways selected for improvement needed to be realigned, a difficult task in itself because of working on the AOA-side of an active airport, but the realignment was further complicated by the need to relocate existing utilities into the right-of-way of

Project Information FAQ

Project Information

3 Q
The project “SFO 'Plot 2' Runway Realignment | Wet Utilities” is an infrastructure initiative in the Airport sector, located in California, United States of America (USA). Taiyo aggregates data on it from Anvil Builders.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Recent studies of San Francisco’s International Airport led to a redesign of certain runways in order to improve overall operating efficiency. The runways selected for improvement needed to be realigned, a difficult task in itself because of working on the AOA-side of an active airport, but the realignment was further complicated by the need to relocate existing utilities into the right-of-way of a public roadway running around the airport’s perimeter. Anvil Builders was contracted by Webcor to take on the difficult task of relocating all wet utilities in South McDonnell Road. This included 3,500 LF of PVC force main; 1,300 LF of 24” PVC potable water lines; and 1,400 LF of 6” steel gas main. Deep excavations were required at each intersection where the new utilities had to be run beneath existing lines. This required the use of a 15’x 45’x 15’ site-specific shored excavation that created an extremely tight work zone between the rerouted vehicular traffic on one side and the active runway on the other. Anvil also had to overcome a number of operational challenges during the course of construction. Differing site conditions and design changes both required numerous realignments to the utility corridor, with each change threatening to extend the project duration and potentially impact the commuting public. Finally, the way the work was interrelated with other contractors and agencies required careful coordination and scheduling during all phases of the work.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data