Sfy 2023 Road Improvement Project
One of 10,000+ projects Taiyo tracks in New Jersey.
Source: Dodge USA
The project includes approximately 795 tons of hot mix asphalt top course, 3,225 SY milling, 2045 SY DGA base course and 570 tons of base course paving, 1380 LF concrete curb, twenty three 23 inlets, 1314 LF of PVC Drainage Pipe and all restoration including road restriping, driveway, stone and landscaping
- Status
- Closed
- Sector
- Cement, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Manufacturing (Industrial), Commercial
- Location
- Beach Haven, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sfy 2023 Road Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes approximately 795 tons of hot mix asphalt top course, 3,225 SY milling, 2045 SY DGA base course and 570 tons of base course paving, 1380 LF concrete curb, twenty three 23 inlets, 1314 LF of PVC Drainage Pipe and all restoration including road restriping, driveway, stone and landscaping |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Beach Haven |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
