SG3 Contract B Small Diameter Rehabilitation
Sector: Waste Processing and Treatment • Location: Georgia, United States of America (USA)
Source: Atlanta Watershed
The Department is continuing the implementation of the Sewer Rehabilitation Program to upgrade its existing small diameter sewers to reduce the amount of extraneous flows, infiltration and inflow (I/I) entering the system, in addition to eliminating sanitary sewer overflows (SSOs) and capacity limitations. The project proposes to rehabilitate the sanitary sewers in Sewer Group Three (SG3), which h
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete / construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Department is continuing the implementation of the Sewer Rehabilitation Program to upgrade its existing small diameter sewers to reduce the amount of extraneous flows, infiltration and inflow (I/I) entering the system, in addition to eliminating sanitary sewer overflows (SSOs) and capacity limitations. The project proposes to rehabilitate the sanitary sewers in Sewer Group Three (SG3), which have been identified under the Sewer System Evaluation Survey (SSES) and as required by the First Amended Consent Decree. To accomplish this objective, the City is proposing system improvements for small diameter sewers situated in both the Proctor Creek and Sandy Creek Sewer Basins. Rehabilitation will extend the life of sewer assets. Structural upgrades to the system are necessary to replace old and deteriorated sewers in order to promote extended service life, reliability, and improve flow conveyance. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Waste Processing and Treatment projects in United States of America (USA)
- US 82 (West of Clarksville), US 82 (East of Clarksville) and US 82 Clarksville Loop Projects
- Memorial Drive from BW 8 to Tallowood Road
- FM 646 from I-45 to Bayshore Boulevard
- SH 36 Improvements in Comanche County
- FM 494
- Pierce County Sewer and Traffic Operations Facility
- Northwest Corridor Managed Lanes P3
- Woodall Rodgers Deck Park
