SG3 Contract C Small Diameter Rehabilitation
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Atlanta Watershed
The Department is continuing the implementation of the Sewer Rehabilitation Program to upgrade its existing small diameter sewers to reduce the amount of extraneous flows, infiltration and inflow (I/I) entering the system, in addition to eliminating sanitary sewer overflows and capacity limitations. To accomplish this objective, the City is proposing system improvements for small diameter sewers s
- Status
- Closed
- Sector
- Commercial, Waste Processing and Treatment, Water Supply and Storage, Manufacturing (Industrial), Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Atlanta Watershed
ConstructChat
Ask ConstructChat about SG3 Contract C Small Diameter Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete / construction |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Department is continuing the implementation of the Sewer Rehabilitation Program to upgrade its existing small diameter sewers to reduce the amount of extraneous flows, infiltration and inflow (I/I) entering the system, in addition to eliminating sanitary sewer overflows and capacity limitations. To accomplish this objective, the City is proposing system improvements for small diameter sewers situated in both the Camp Creek and Utoy Creek Sewer Basins and will be located in approximately eleven sewer sheds. This project is necessary to meet the requirements of the Second Amended Consent Decree (SACD), which prescribes evaluation and improvement measures to eliminate sanitary sewer overflows (SSOs) and to protect the City’s investment in upgraded water reclamation facilities. Structural upgrades to the system are necessary to replace old and deteriorated sewers in order ensure the extended service life, reliability, and improve flow conveyance. The current milestone completion date for the work under this project is July 1, 2020. The scope of this project includes: Pre-cleaning sewers, Lining of sewers using Cured-in-Place pipe (CIPP) liner, Replacing sewers through pipe bursting, Installing new sewer sections using horizontal directional drilling methods, Replacing sewer through open-cut method, Addressing defects in short pipe sections through internal and external point repairs, Rehabilitating manholes |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source reliability | High |
Source | Atlanta Watershed |
URL |
More Details
Record type | Project |
Sector | Commercial, Waste Processing and Treatment, Water Supply and Storage, Manufacturing (Industrial), Government |
Article published date | 2023-11-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America (USA)
- Auburn Avenue Historic and Cultural Information Project
- Zone Change from CO-NC to IBP
- A Bridge Home Projects
- Maintenance and operations funding
- Chemical sciences modernization
- Intrenchment Creek Viaduct Rehabilitation
- Bolton Road & Phillip Lee Pump Stations Rehabilitation
- Pump Stations Improvement: Niskey Lake 1 & 2, Rivermeade, and Highlands
