logo
ProjectComplete / Construction

SG3 Contract C Small Diameter Rehabilitation

One of 10,000+ projects Taiyo tracks in Georgia.

Source: Atlanta Watershed

The Department is continuing the implementation of the Sewer Rehabilitation Program to upgrade its existing small diameter sewers to reduce the amount of extraneous flows, infiltration and inflow (I/I) entering the system, in addition to eliminating sanitary sewer overflows and capacity limitations. To accomplish this objective, the City is proposing system improvements for small diameter sewers s

Status
Closed
Sector
Commercial, Waste Processing and Treatment, Water Supply and Storage, Manufacturing (Industrial), Government
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Atlanta Watershed

ConstructChat

Ask ConstructChat about SG3 Contract C Small Diameter Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SG3 Contract C Small Diameter Rehabilitation” is an infrastructure initiative in the Commercial sector, located in Georgia, United States of America (USA). Taiyo aggregates data on it from Atlanta Watershed.

Participants

Sponsoring Agency

Status

Original status

complete / construction

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Department is continuing the implementation of the Sewer Rehabilitation Program to upgrade its existing small diameter sewers to reduce the amount of extraneous flows, infiltration and inflow (I/I) entering the system, in addition to eliminating sanitary sewer overflows and capacity limitations. To accomplish this objective, the City is proposing system improvements for small diameter sewers situated in both the Camp Creek and Utoy Creek Sewer Basins and will be located in approximately eleven sewer sheds. This project is necessary to meet the requirements of the Second Amended Consent Decree (SACD), which prescribes evaluation and improvement measures to eliminate sanitary sewer overflows (SSOs) and to protect the City’s investment in upgraded water reclamation facilities. Structural upgrades to the system are necessary to replace old and deteriorated sewers in order ensure the extended service life, reliability, and improve flow conveyance. The current milestone completion date for the work under this project is July 1, 2020. The scope of this project includes: Pre-cleaning sewers, Lining of sewers using Cured-in-Place pipe (CIPP) liner, Replacing sewers through pipe bursting, Installing new sewer sections using horizontal directional drilling methods, Replacing sewer through open-cut method, Addressing defects in short pipe sections through internal and external point repairs, Rehabilitating manholes

Budget

Location

Country

United States of America (USA)

State

Georgia

Source

Source reliability

High

Source

Atlanta Watershed

URL

More Details

Record type

Project

Sector

Commercial, Waste Processing and Treatment, Water Supply and Storage, Manufacturing (Industrial), Government

Article published date

2023-11-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project