logo

SG3 Contract C Small Diameter Rehabilitation

Sector: Commercial • Location: Georgia, United States of America (USA)

Source: Atlanta Watershed

Project
Complete / Construction

The Department is continuing the implementation of the Sewer Rehabilitation Program to upgrade its existing small diameter sewers to reduce the amount of extraneous flows, infiltration and inflow (I/I) entering the system, in addition to eliminating sanitary sewer overflows and capacity limitations. To accomplish this objective, the City is proposing system improvements for small diameter sewers s

Project Information FAQ

Project Information

5 Q
The project “SG3 Contract C Small Diameter Rehabilitation” is an infrastructure initiative in the Commercial sector, located in Georgia, United States of America (USA). Taiyo aggregates data on it from Atlanta Watershed.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete / construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Department is continuing the implementation of the Sewer Rehabilitation Program to upgrade its existing small diameter sewers to reduce the amount of extraneous flows, infiltration and inflow (I/I) entering the system, in addition to eliminating sanitary sewer overflows and capacity limitations. To accomplish this objective, the City is proposing system improvements for small diameter sewers situated in both the Camp Creek and Utoy Creek Sewer Basins and will be located in approximately eleven sewer sheds. This project is necessary to meet the requirements of the Second Amended Consent Decree (SACD), which prescribes evaluation and improvement measures to eliminate sanitary sewer overflows (SSOs) and to protect the City’s investment in upgraded water reclamation facilities. Structural upgrades to the system are necessary to replace old and deteriorated sewers in order ensure the extended service life, reliability, and improve flow conveyance. The current milestone completion date for the work under this project is July 1, 2020. The scope of this project includes: Pre-cleaning sewers, Lining of sewers using Cured-in-Place pipe (CIPP) liner, Replacing sewers through pipe bursting, Installing new sewer sections using horizontal directional drilling methods, Replacing sewer through open-cut method, Addressing defects in short pipe sections through internal and external point repairs, Rehabilitating manholes

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data