Active

Solar Guys International (SGI), and Mitabu Australia developed the 50MW first phase of a project named "1 solar watt per person" expected to total 250MW.

The project was expected to use Kyocera Solar’s 320W c-Si poly PV modules. The project holds a PPA. The project holds a MOU with the Indonesian Ministry of Energy and Mineral Resources to develop the full 250 MW. All contracts were expected to

Status
Prospective
Sector
Cable car, Government, Power Generation (CCGT), Solar, Automotive, Commercial, Telecommunications
Location
Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about SGI-Mitabu Solar Plant Phase I

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SGI-Mitabu Solar Plant Phase I” is an infrastructure initiative in the Cable car sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Solar Guys International (SGI), and Mitabu Australia developed the 50MW first phase of a project named "1 solar watt per person" expected to total 250MW. The project was expected to use Kyocera Solar’s 320W c-Si poly PV modules. The project holds a PPA. The project holds a MOU with the Indonesian Ministry of Energy and Mineral Resources to develop the full 250 MW. All contracts were expected to be completed by mid-2013. Construction was expected to start immediately thereafter, and take over 12 months. Islamic financing was applied following a government initiative to promote the practice. Financial closure was reported in November 2012, via Islamic Bond (osshore-domiciled Sukuk) of A$100 million (US$104 million) with a 7 year tenor. The full 250MW was expected to require A$550 million in financing, all of which was expected to be done under Islamic principles. The financiers have informed the developer that funding is available for the entire 250MW, dealt out in tranches for each 50MW parcel. The initial Sukuk is domiciled in Labuan, an offshore financial center in Malaysia. The placing was expected to be almost 100% with local Malaysian investors. During the construction period, the financing follows an 'Istisna', where goods are paid for and subsequently produced and delivered. The cashflow back to the investors is established under a Ijara structure - similar to a rental agreement. After 20 years, this would change to a Musharaka structure, sharing returns between the developer and the investors under a profit-sharing ratio. http://www.pv-tech.org/news/sgi_mitabu_secures_funds_for_50mw_plant_in_indonesia http://www.themalaysianinsider.com/business/article/australian-solar-consortium-plans-offshore-sukuk http://www.pfie.com/solar-guys-plan-indonesian-sukuk/21066934.article http://www.solarserver.com/solar-magazine/solar-news/current/2012/kw45/solar-guys-international-mitabu-australia-secure-funding-for-50-mw-pv-project-in-indonesia.html

Original sector

Energy

Budget

Location

Country

Indonesia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Cable car, Government, Power Generation (CCGT), Solar, Automotive, Commercial, Telecommunications

Article published date

2024-05-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project